MSD Bastet Pharmaceutical Facility, Igoville, France

  • Bygningstype:
  • Industribygg
  • Lager
Full skjerm Avslutt

Construction of a new industrial process building for pharmaceutical production, packaging, and storage.

Use of our DELTABEAM® Composite beam, with pre-slab, in order eliminate beam fallout and ensure fireproofing for up to 120 minutes.

Prosjektinformasjon

Prosjektstørrelse:
1550 m2
Etasjer:
R+3
Entreprenør:
GTM Normandie
Arkitekt:
Arching. Building for Living

Vi leverte

    Kontakt oss

    Sabri ALPTUNA

    Sabri ALPTUNA

    Directeur commercial adjoint

    Mob. +33 (0) 6 47 86 91 55
    [email protected]