Community Facility of Jamsil Jinju Apartment, Songpa-gu, Seoul, South Korea

  • Bygningstype:
  • Detaljhandel
Full skjerm Avslutt

This project applied a dry joint system to the stair core of the community facility within the apartment complex.

The construction-stage analysis was divided into three phases: after core element installation and before grout curing, after grout curing, and finally the stage where the core interacts with the main structural system. The construction was completed quickly and safely.

Prosjektinformasjon

Utvikler:
Samsung C&T Corporation
Entreprenør:
Samsung C&T Corporation
RIB:
RISE STRUCTURAL ENGINEERING
Arkitekt:
TAEHWA ENGINEERING CO., LTD (SHOP DESIGN)
Prefab produsent:
KC INDUSTRY
Levert, år:
2023
Ferdigstilt, år:
2023

Kontakt oss